Then come the Poles. First the poles were oiled to protect from the weather, then prepped for Standing. Here Tony Vidana personally cuts the slots to accommodate the hardware in the poles. The poles had to be stood with a crane… How were they installed? Very, very carefully.
The poles are stood, the first floor is framed and the second floor is joisted. Here the crew is sheeting for the second floor. Now comes the hard part, the second floor and the roof
The second floor took considerably longer to frame than the first floor. Lots of beams and walls. But it is coming along.